Balcony Solar Laws & UL Certification by State

Which states let you plug a solar panel into an ordinary outlet, the wattage cap in each law, and — the part no one else tracks — exactly what UL certification the law demands. Every enacted state links to the bill text so you can verify it yourself.

8states signed into law
2name UL 3700 by name
15bills in progress
StateStatusBillCapCertification requiredUL 3700?
CO Colorado Enacted HB26-1007 1,920 W NRTL labeled & listed No
CT Connecticut Enacted HB 5340 (Public Act 26-127) 1,200 W UL 1741 + NEC + IEEE 1547 No
ME Maine Enacted LD 1730 / SP 676 (Public Law Ch. 644) 1,200 W AC UL 3700 (by name) Yes
MD Maryland Enacted HB 1532 (Chapter 353) 1,200 W UL / NRTL No
NH New Hampshire Enacted SB 540-FN (Chapter 262) 1,200 W AC NRTL No
UT Utah Enacted HB 340 1,200 W UL / NRTL + NEC No
VT Vermont Enacted S.202 (Act 84) 1,200 W UL 3700 (by name) Yes
VA Virginia Enacted HB 395 (Chapter 1052) 1,200 W NRTL (29 CFR 1910.7) No
CA California Bill pending SB 868 1,200 W AC UL / NRTL + NEC No
DE Delaware Bill pending SB 270 NEC + IEEE 1547 (no UL) No
DC District of Columbia Bill pending B26-0602 1,200 W UL / NEC (UL 3700 reported) No
MA Massachusetts Bill pending H 5175 (H 4744 / H 5151) 1,200 W UL (reported) No
MI Michigan Bill pending HB 5764 NEC + anti-islanding (reported) No
MN Minnesota Bill pending HF 3555 / SF 4774 Federally recognized lab No
NJ New Jersey Bill pending S 2368 / A 4836 1,200 W AC UL / NRTL No
NY New York Bill pending S 8512C / A 9111C 1,200 W AC NRTL (generic) No
NC North Carolina Bill pending HB 1129 UL + NC Electrical Code No
OH Ohio Bill pending HB 755 NEC + NRTL (reported) No
OK Oklahoma Bill pending HB 4060 1,200 W AC None (safety only) No
OR Oregon Bill pending HB 4080 UL / NRTL listed No
PA Pennsylvania Bill pending HB 1971 1,200 W UL / NRTL No
RI Rhode Island Bill pending H 7269 / S 2658 1,200 W AC UL / NRTL + NEC No
SC South Carolina Bill pending H. 4579
AK Alaska Stalled 2026 HB 257 Safety std + anti-islanding No
AZ Arizona Stalled 2026 HB 2843 / SB 1606 NRTL + NEC No
GA Georgia Stalled 2026 HB 1304 UL / NRTL No
HI Hawaii Stalled 2026 SB 2902 (also HB 2435) 1,200 W Not confirmed No
ID Idaho Stalled 2026 H0612 UL / NRTL + NEC No
IL Illinois Stalled 2026 SB 3104 (HB 4524) Labeling + cert (reported) No
IN Indiana Stalled 2026 SB 74 / HB 1084 UL / NRTL + NEC No
IA Iowa Stalled 2026 HF 2046 (SF 2056) National electrical/safety std No
MO Missouri Stalled 2026 HB 2528 (HB 2444) None in summary No
WA Washington Stalled 2026 HB 2296 (Chapter 136, Laws 2026)
WY Wyoming Stalled 2026 HB 146 UL / NRTL No
NM New Mexico No specific law
AL Alabama Tracking
AR Arkansas Tracking
FL Florida Tracking
KS Kansas Tracking
KY Kentucky Tracking
LA Louisiana Tracking
MS Mississippi Tracking
MT Montana Tracking
NE Nebraska Tracking
NV Nevada Tracking
ND North Dakota Tracking
SD South Dakota Tracking
TN Tennessee Tracking
TX Texas Tracking
WV West Virginia Tracking
WI Wisconsin Tracking

The one distinction that matters: "UL" vs "UL 3700"

Most of these laws require a device to be "certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory." That names an organization — it does not require the UL 3700 plug-in-PV standard specifically. Only Maine and Vermont name UL 3700 in the statute itself. A microinverter can be legitimately "UL certified" (to UL 1741) and still never have been tested as a plug-in system. Read the full explainer →

How we track this

Every enacted-state row is read from the enrolled bill text or signed act, not from another tracker, and links to that primary source. Where a law is ambiguous — several caps say "maximum power output" without specifying AC or DC — we say so instead of guessing. States marked "Tracking" have reported activity we haven't yet confirmed to a primary source; we publish a state page only once its facts carry a citation. This page is not legal advice.